The offer

An integrated offer from a leading contractor

SABELLA will be responsible for:

Environmental, characterisation and site selection studies

Obtaining concessions for the use of the public maritime domain and administrative authorisations, for third parties

Constructing turbines according to site size criteria

Installing the turbines in situ

Linking the system to land for export and connecting to the grid

Conducting reception tests and signal qualification tests

Ensuring maintenance of the installation

Thus, the Client-Operator receives an integrated solution from a single supplier, and benefits from an efficient hydroelectric asset “ready to generate”.

SABELLA positions itself not only as a turbine manufacturer (OEM) but also as an installer by drawing on the resources of an engineering firm composed of qualified engineers with specific knowledge of tidal energy production.

NEWS

  • SABELLA is to take part in ICOE 2010 in Bilbao (Spain) in October 2010.
  • "Sabella D03" is temporarily on show at the ADEME Innovation Forum at the Cité des Sciences, Vilette - Paris on 23 June 2010.
  • SABELLA ENERGIE INC. was created in January 2010 in Canada to implement the development of tidal turbine technologies on the American continents.
  • SABELLA SAS responded to the AMI tender launched by ADEME to construct its demonstrator "D10". Response due in June 2010.

REFERENCES

  • SABELLA SAS received the award “Durable – ACTINE STRATEGIES” at INNOVACT 2009 in Reims.
140 bd. de Creac'h Gwenn - 29000 Quimper